To apply marbelite to an existing pool, the pool is drained, the old surface is chipped back where it’s hollow and cleaned until it’s sound, and the new marbelite is mixed on site and hand trowelled onto the walls and then the floor in a single day. Once it has firmed up, the pool is filled in one go, and the surface finishes curing under water over the next few weeks.
That’s the short version. The preparation days decide whether the new surface lasts, and the first month after filling decides how it looks. Here’s what our team does at each stage, and what you’ll be asked to do once we hand it back.
| Stage | What happens | Typical time |
|---|---|---|
| 1. Inspect and drain | Leak and crack checks, then the pool is pumped out | Day 1 |
| 2. Prepare the shell | Hollow plaster chipped off, surface cleaned, cracks repaired | 1 to 3 days, depending on the pool |
| 3. Application day | Marbelite mixed and trowelled, walls first, then the floor | One full day |
| 4. Filling | Pool filled from the deep end in one go | Usually starts within about a day |
| 5. Start-up | Daily brushing, backwashing and water balancing | The first three to four weeks |
Before We Apply Marbelite: The Checks That Decide the Job
A new surface over an unsolved problem only hides it. Before anyone mixes a bag, we want to know three things.
- Is the pool leaking? If the level drops more than evaporation explains, we find out why first. Proper pool leak detection comes before resurfacing, because new marbelite won’t fix a cracked pipe.
- Are the cracks surface crazing or structural? Fine crazing gets prepared and covered. Cracks that move need proper repair. Our guide on how to fix a pool crack explains the difference.
- Is marbelite still the right finish? On a pool that keeps cracking, relining may suit it better. We compare the two in fibreglass vs marbelite pools.
If you’re still deciding whether your surface really is finished, start with our guide to the signs of pool resurfacing being due.

Preparing the Old Surface
Marbelite bonds to a sound, clean, rough cement surface. It won’t hold onto loose plaster, algae, scale or old paint, so this is where most of the labour goes.
Draining and making it safe
We pump the pool out to waste and keep an eye on the ground. In a wet Cape winter, a high water table can push on an empty shell, so we don’t leave a pool standing empty longer than it has to be.
Tapping and chipping
Every wall and the floor gets tapped. Anywhere that sounds hollow has lifted off the shell and is chipped back to solid material. On older pools that have been re-marbelited before, this can be a fair amount of the surface.
Cleaning back to a sound surface
The surface is acid washed or ground where needed to remove stains, scale and algae, neutralised and rinsed. Any painted areas or old coatings have to come off completely, because marbelite won’t bond to paint.
Repairs, tiles and fittings
Cracks are opened and repaired, badly damaged areas are re-plastered, and loose waterline tiles are re-bedded or replaced. Lights, jets, skimmer mouths and steps are protected so the new surface finishes neatly around them. If a section needs a new base coat, the right pool plaster thickness and curing time matter, and we cover those separately.
Questions worth asking at this stage
- How much hollow plaster did you find, and were any cracks structural?
- Are the waterline tiles staying, being re-bedded or being replaced?
- Which colour is going on? Our guide to marbelite pool colours helps you choose.
How We Apply Marbelite on the Day
Application day starts early and doesn’t stop until the last section of floor is finished. The whole pool is done in one day, because marbelite applied on different days leaves visible joins.
- Damp the surface. The prepared shell is wetted so it doesn’t suck water out of the fresh marbelite. Standing water is swept off the floor.
- Mix in batches. Marbelite is mixed with a measured amount of clean water to a stiff, workable plaster. Adding extra water to make it easier to spread weakens it and causes colour variation, so we don’t.
- Walls first. A first layer is pressed tightly onto the wall with a steel trowel, followed straight away by a second to build the thickness. Steps and benches are formed as the team goes.
- Then the floor. The floor is plastered working from the deep end back towards the steps, so nobody has to walk on finished work.
- Re-trowel as it firms. As the marbelite starts to set, it’s trowelled again, and again near the end, to close the surface and get it smooth.

Timing the final trowelling takes experience. Too early and the surface stays rough. Too late, or too hard, and the trowel burns dark marks into the finish. It’s the main reason resurfacing is a team job and not a weekend project.

Filling the Pool After We Apply Marbelite
Once the surface has firmed up, usually that evening or the next morning depending on the product and the weather, filling starts. From here the marbelite cures under water.
- From the deep end. The hose goes in at the deepest point with a cloth or deflector on the end, so the water can’t gouge the soft floor.
- In one go. If filling stops halfway, a permanent tide mark can form where the water sat. Keep the hose running until the pool is full, day and night.
- Keep exposed walls damp. While the level rises, the surface above the water is kept wet so it doesn’t dry out too fast and craze.
- Mind the weather. Heavy rain on fresh marbelite can mark it, so we watch the forecast and protect the surface if a shower comes through.
A home pool can take a day or more to fill from a hose, so some owners book a water delivery. Either way, test the water as soon as it’s in, because soft tap water pulls calcium out of a new surface.
The First Month: Curing and Start-Up
New marbelite releases fine dust for the first few weeks. How you treat the pool in this period shows up in the finish for years.
Do
- Brush the whole pool gently every day with a soft brush
- Backwash and vacuum to waste as the dust settles
- Test and balance pH, alkalinity and calcium hardness from day one
- Add chemicals through the skimmer, diluted and as the label says
- Ask us before adding anything you’re unsure of
Don’t
- Run an automatic pool cleaner for about the first three weeks
- Use a wheeled vacuum head that can scratch the soft surface
- Switch on a salt chlorinator until we say it’s time
- Let the water level drop and expose the new surface
- Acid wash a new surface to remove early marks
Always add chemicals to water, never water to chemicals, and never mix acid and chlorine. Our guide to swimming pool plaster dust covers this stage in more detail.
What Goes Wrong When People Apply Marbelite Badly
| Problem | What causes it | How it’s avoided |
|---|---|---|
| Fine crazing | Surface dried too fast in heat or wind | Damping, timing the work and keeping exposed walls wet |
| Tide mark or ring | Filling stopped partway | Filling non-stop from the deep end |
| Patchy, mottled colour | Uneven water in the mix, joins, poor water balance | Measured mixing, one-day application, early water care |
| Dark trowel marks | Over-trowelling as it sets | Experience and a wetted trowel on the final pass |
| Hollow patches later | Poor preparation or a dirty, painted or loose base | Chipping back to sound plaster and proper cleaning |
| Early roughness | Aggressive, unbalanced water in the first weeks | Testing and balancing from the day it’s filled |
When we’re called to a pool that’s only a few years old and already rough or hollow, the cause is nearly always rushed preparation or a skipped start-up.

Western Cape Weather and Marbelite
Rain is the main enemy before filling, and hot, dry wind is the main enemy on application day. We avoid the wettest winter weeks and plan hot summer jobs for an early start, so the critical trowelling isn’t done in the midday sun or a howling south-easter. Mild autumn and spring days are ideal.
Can You Apply Marbelite Yourself?
Small chips can be patched, but a full resurface is a one-shot job for a team that’s done it many times. If it goes wrong, the fix is to chip it off and start again. For what a professional job costs, see our pool resurfacing cost guide, and for the finish itself our marbelite pool surfacing page.
Thinking about re-marbeliting your pool?
Our team will check for leaks and hollow plaster, explain exactly what preparation your pool needs, and give you a written quote and timeline before we start.
Call 074 378 6623, WhatsApp us, or email info@poolsreno.co.za. See our pool renovation services for marbelite, fibreglass relining and painting.
Applying Marbelite: Frequently Asked Questions
The application itself is done in one day. With draining, preparation and repairs before it, most home pools are done within about 5 to 10 working days on site, and the pool can be filled within about a day of application.
Usually once the surface has firmed up, which is often that evening or the next morning depending on the product and the weather. The pool should then be filled in one go from the deep end so no tide mark forms.
Once the water is balanced and the chlorine is at a normal level, usually within a few days of filling. Keep brushing daily for the first weeks and hold off on the automatic cleaner for about three weeks.
Fresh marbelite releases fine plaster dust while it cures. Brushing daily, backwashing and keeping the water balanced clears it over the first few weeks. Dust that carries on for months usually points to water that’s out of balance.